In this method, a round gap is excavated up into the depth at which the soil will stand unsupported (about 0.5m for tender clay and 2m for rigid clay). Vertical boards often called laggings, are then set in position around the excavated encounter and are held tightly against the soil https://sethjvcip.canariblogs.com/foundation-pile-testing-bd-an-overview-45921107