The 25mm thick heavy metal tube is pushed Together with the conclusion closed by a metal shoe. On achieving the expected driving resistance, a complete length cage is lowered in to your tube and filled with significant slump concrete. The tube is then vibrated out leaving a shaft of concrete. https://fernandosvtrm.ltfblog.com/31638423/5-simple-statements-about-cast-in-situ-piles-in-bangladesh-explained